Engineering report · reviewed against NEC 2026 & BS 7671:2018+A2
Engineering Breakdown: Running a 15 Cu. Ft. Deep Chest Freezer on the Selectronic SP Pro AU Off-Grid Inverter
When pairing the Selectronic SP Pro AU Off-Grid Inverter (10,240 Wh LiFePO4 capacity, 7,500 W continuous, 22,500 W surge) with a 15 Cu. Ft. Deep Chest Freezer (90 W running, 750 W starting surge), the system operates at 1% of continuous inverter capacity on a 230 V UK/EU/AU circuit. At a 100% duty cycle and 85% inverter efficiency, a full battery delivers roughly 4.0 days of off-grid runtime. Wiring the connection over a 7.5 m run calls for a 6 A MCB and 1.5 mm² copper, terminated at a BS 1363 13A / Schuko CEE 7/4 / AS/NZS 3112 10A connection.
1. Compatibility Verdict & Inverter Load Utilization
In UK/EU/AU 230 V mode the 15 Cu. Ft. Deep Chest Freezer loads the Selectronic SP Pro AU Off-Grid Inverter's inverter to 1% of its 7,500 W continuous rating and 3% of its 22,500 W surge rating. Both figures are under the 80% sustained-load guideline, so this is a comfortable, verified match with 7,410 W of spare capacity for lights, a router or a refrigerator on the same unit.
| Check | Load requires | Selectronic SP Pro AU Off-Grid Inverter provides | UK/EU/AU |
|---|---|---|---|
| Continuous output | 90 W | 7,500 W | Pass |
| Start-up surge | 750 W | 22,500 W | Pass |
| Voltage | 230 V | 230 V | Pass |
| Connection | BS 1363 13A / Schuko CEE 7/4 / AS/NZS 3112 10A | Hardwired consumer unit (RCBO protected) |
Compressor appliances such as refrigerators and freezers draw very little on average — 90 W while running — but need 750 W for a moment each time the compressor kicks on. Their duty cycle is typically 30–40%, which is why a modest battery can keep food safe for a long time. The Selectronic SP Pro AU Off-Grid Inverter's 22,500 W surge rating comfortably handles each restart.
The Selectronic SP Pro AU Off-Grid Inverter is a heavy-duty off-grid inverter-charger built for rural properties, with a surge rating of 22,500 W — 3.0× its continuous output — designed to start bore pumps, workshop compressors and other large motors.
2. Real-World Runtime by Duty Cycle
Nameplate capacity is not usable capacity. DC-to-AC conversion, battery management overhead and cell protection reduce the 10,240 Wh rating to about 8,704 Wh of deliverable AC energy (85% system efficiency). Duty cycle is the share of each hour the load actually draws its running power — thermostats, pressure switches and intermittent use all lower it.
| Duty cycle | Average draw | Runtime (no solar) | Energy per 24 h |
|---|---|---|---|
| 25% | 23 W | 16.1 days | 0.5 kWh |
| 50% | 45 W | 8.1 days | 1.1 kWh |
| 65% | 59 W | 6.2 days | 1.4 kWh |
| 100% | 90 W | 4.0 days | 2.2 kWh |
At a 50% duty cycle the Selectronic SP Pro AU Off-Grid Inverter covers a full day (8.1 days) without any recharge — ample for a typical overnight outage.
3. BS 7671 / IEC 60364 Breaker & Cable Sizing
IEC-based codes size protection by design current rather than a blanket 125% multiplier: Ib ≤ In ≤ Iz. At 230 V the load draws 0.4 A, so a 6 A Type B/C MCB with RCD protection applies. In the UK, BS 7671 Section 722 additionally requires a dedicated circuit and Type A or Type B RCD for EV charge points.
| One-way distance | MCB | Min. cable | Voltage drop |
|---|---|---|---|
| 7.5 m (25 ft) | 6 A | 1.5 mm² | 0.03% |
| 15 m (49 ft) | 6 A | 1.5 mm² | 0.06% |
| 22.5 m (74 ft) | 6 A | 1.5 mm² | 0.09% |
| 30 m (98 ft) | 6 A | 1.5 mm² | 0.12% |
Because the current is modest, 1.5 mm² copper stays within the voltage-drop target all the way to 30 m.
4. Solar Array Recharge Time Breakdown
The Selectronic SP Pro AU Off-Grid Inverter accepts up to 8,000 W of photovoltaic input. Real arrays rarely deliver nameplate output, so we apply an 80% harvest factor for MPPT conversion, cell temperature and soiling, and convert hours to days using 4.5 peak-sun-hours — a conservative annual average for the US, southern Europe and Australia (UK winters can fall below 1.5).
| PV array | Real harvest | 0–100% recharge | Sun-days @ 4.5 PSH | Net with load @ 50% |
|---|---|---|---|---|
| 800 W | 640 W | 16.0 hrs | 3.6 | +595 W |
| 1,600 W | 1,280 W | 8.0 hrs | 1.8 | +1,235 W |
| 3,000 W | 2,400 W | 4.3 hrs | 0.9 | +2,355 W |
| 6,000 W | 4,800 W | 2.1 hrs | 0.5 | +4,755 W |
| 8,000 W | 6,400 W | 1.6 hrs | 0.4 | +6,355 W |
A typical 800 W portable array refills the battery in about 16.0 hrs of strong sun, while maxing out the 8,000 W input cuts that to 1.6 hrs. To fully offset the 15 Cu. Ft. Deep Chest Freezer at a 50% duty cycle (45 W average) during daylight you need roughly 100 W of panels, which this unit can accept.
5. Frequently Asked Questions
Can the Selectronic SP Pro AU Off-Grid Inverter run a 15 Cu. Ft. Deep Chest Freezer?
Yes. The Selectronic SP Pro AU Off-Grid Inverter delivers 7,500 W continuous and 22,500 W surge, covering the 15 Cu. Ft. Deep Chest Freezer's 90 W running and 750 W start-up draw at 1% inverter utilization.
How long will the Selectronic SP Pro AU Off-Grid Inverter run a 15 Cu. Ft. Deep Chest Freezer?
With 10,240 Wh of capacity and 85% inverter efficiency, expect about 4.0 days of continuous operation and 8.1 days at a 50% duty cycle. Adding solar input during the day extends this further.
What breaker and wire size do I need to connect a 15 Cu. Ft. Deep Chest Freezer to the Selectronic SP Pro AU Off-Grid Inverter?
At 230 V the load draws 0.4 A. Under BS 7671 / IEC 60364 the protective device must be at least the design current (Ib ≤ In ≤ Iz), so use a 6 A MCB with RCD protection on 1.5 mm² copper cable for runs up to 7.5 m (0.0% voltage drop). Connection: BS 1363 13A / Schuko CEE 7/4 / AS/NZS 3112 10A.
How long does it take to recharge the Selectronic SP Pro AU Off-Grid Inverter with solar panels?
With an 800 W array and an 80% real-world harvest factor, a full recharge takes about 16.0 hrs of peak sun (3.6 days at 4.5 peak-sun-hours). At its maximum 8,000 W solar input it drops to 1.6 hrs.
Methodology & safety note
Specifications come from manufacturer datasheets in our open dataset; ampacity and resistance values follow NEC Table 310.16 and Chapter 9 Table 8, and BS 7671 Appendix 4. Calculations assume copper conductors, 30 °C ambient and no bundling derating. Inverter-to-panel connections require a listed transfer switch or interlock to prevent back-feeding the grid. These results are an engineering estimate, not a substitute for a licensed electrician and local permit. See our methodology and safety disclaimer.