Skip to content
GRIDSPEC
Verified Engineering Spec • IEC 60364 / BS 7671

Can the Selectronic SP Pro AU Off-Grid Inverter Run a Kia EV9 (32A Level 2 EV Charger)?

Live runtime simulator, solar recharge calculator and NEC / IEC breaker & cable schematic for the Selectronic SP Pro AU Off-Grid Inverter (10,240 Wh) paired with the Kia EV9 (32A Level 2 EV Charger).

Configure your system

800 W
7.6 m (25 ft)
100%
Source outlets
Hardwired consumer unit (RCBO protected)
Load connection
Type 2 EVSE · IEC 60309 32A Commando
EV range rate
≈ 23 mi (37 km) of range per hour of charging
Verified Hardware Match

Works today. For more headroom, the Sungrow SH10RS Hybrid Inverter + Battery runs it at 74% load.

As an Amazon Associate, we earn from qualifying purchases.

Compatible · High Load

Runs the load, but at 98% of continuous capacity.

Above the 80% sustained-load guideline — expect fan noise, heat and reduced headroom for other loads.

Continuous load
98%
Runtime (no sun)
1.2 hrs
100% duty · 85% inverter eff.
Solar recharge
16.0 hrs
3.6 sun-days at 800 W
Min. copper wire
4.0 mm²
1.0% drop @ 7.6 m
Overcurrent device
32A MCB
32.0A load × 1.00 = 32.0A
Live schematic & breaker sizing diagram 230V AC • IEC 60364
SOLAR PV INPUT 800 W PV MC4 / XT60 · MPPT POWER SOURCE / INVERTER Selectronic SP Pro AU Off-Grid Inverter 10,240 Wh • 7,500 W 22,500 W surge • 120/240V 98% load 32A MCB 4.0 mm² Cu 32.0A @ 230V CONNECTED LOAD Kia EV9 (32A Level 2 EV Charger) 7,360 W running 7,360 W surge 230V load

Engineering report · reviewed against NEC 2026 & BS 7671:2018+A2

Engineering Breakdown: Running a Kia EV9 (32A Level 2 EV Charger) on the Selectronic SP Pro AU Off-Grid Inverter

UK/EU/AU: Compatible · High Load 98% inverter utilization Sold in UK / EU / AU only

When pairing the Selectronic SP Pro AU Off-Grid Inverter (10,240 Wh LiFePO4 capacity, 7,500 W continuous, 22,500 W surge) with a Kia EV9 (32A Level 2 EV Charger) (7,680 W running, 7,680 W starting surge), the system operates at 98% of continuous inverter capacity on a 230 V UK/EU/AU circuit. At a 100% duty cycle and 85% inverter efficiency, a full battery delivers roughly 1.2 hrs of off-grid runtime. Wiring the connection over a 7.5 m run calls for a 32 A MCB and 4.0 mm² copper, terminated at a Type 2 EVSE · IEC 60309 32A Commando connection.

1. Compatibility Verdict & Inverter Load Utilization

In UK/EU/AU 230 V mode the Kia EV9 (32A Level 2 EV Charger) loads the Selectronic SP Pro AU Off-Grid Inverter's inverter to 98% of its 7,500 W continuous rating and 33% of its 22,500 W surge rating. The pairing works, but running above 80% for hours raises internal temperatures and fan noise, and leaves little room for other loads. Treat it as a dedicated circuit.

CheckLoad requiresSelectronic SP Pro AU Off-Grid Inverter providesUK/EU/AU
Continuous output 7,360 W 7,500 W Pass
Start-up surge 7,360 W 22,500 W Pass
Voltage 230 V 230 V Pass
Connection Type 2 EVSE · IEC 60309 32A Commando Hardwired consumer unit (RCBO protected)

An EVSE is a constant-current device: the vehicle draws exactly the current advertised by the J1772/NACS pilot signal, so the 7,680 W figure is both the running load and the start-up load — there is no motor inrush. That makes the calculation unusually clean. If you want to stay under the 80% sustained-load guideline, set the charge current in the vehicle app to 25 A or less, which keeps the Selectronic SP Pro AU Off-Grid Inverter at roughly 6,000 W. A full battery delivers about 7.8 kWh into the pack after inverter and on-board charger losses, worth roughly 27 miles (44 km) of driving at 3.5 mi/kWh.

The Selectronic SP Pro AU Off-Grid Inverter is a heavy-duty off-grid inverter-charger built for rural properties, with a surge rating of 22,500 W — 3.0× its continuous output — designed to start bore pumps, workshop compressors and other large motors.

2. Real-World Runtime by Duty Cycle

Nameplate capacity is not usable capacity. DC-to-AC conversion, battery management overhead and cell protection reduce the 10,240 Wh rating to about 8,704 Wh of deliverable AC energy (85% system efficiency). EV charging runs at a fixed current, so the 100% row is the realistic figure; lower rows apply only if you schedule charging in intervals.

Runtime (h) = (10,240 Wh × 0.85) ÷ (7,360 W × duty cycle)
Duty cycleAverage drawRuntime (no solar)Energy per 24 h
25% 1,840 W 4.7 hrs 44.2 kWh
50% 3,680 W 2.4 hrs 88.3 kWh
65% 4,784 W 1.8 hrs 114.8 kWh
100% 7,360 W 1.2 hrs 176.6 kWh

Even at a 50% duty cycle the battery lasts 2.4 hrs, so plan on solar, grid or generator recharging for anything longer than an evening outage.

3. BS 7671 / IEC 60364 Breaker & Cable Sizing

IEC-based codes size protection by design current rather than a blanket 125% multiplier: Ib ≤ In ≤ Iz. At 230 V the load draws 32.0 A (the EVSE's 32 A pilot current at 230 V), so a 32 A Type B/C MCB with RCD protection applies. In the UK, BS 7671 Section 722 additionally requires a dedicated circuit and Type A or Type B RCD for EV charge points.

One-way distanceMCBMin. cableVoltage drop
7.5 m (25 ft) 32 A 4.0 mm² 0.96%
15 m (49 ft) 32 A 4.0 mm² 1.92%
22.5 m (74 ft) 32 A 4.0 mm² 2.89%
30 m (98 ft) 32 A 6.0 mm² 2.57%

Moving the Selectronic SP Pro AU Off-Grid Inverter from 7.5 m to 30 m away forces the conductor up from 4.0 mm² to 6.0 mm² — park the unit as close to the load as ventilation and weather protection allow.

4. Solar Array Recharge Time Breakdown

The Selectronic SP Pro AU Off-Grid Inverter accepts up to 8,000 W of photovoltaic input. Real arrays rarely deliver nameplate output, so we apply an 80% harvest factor for MPPT conversion, cell temperature and soiling, and convert hours to days using 4.5 peak-sun-hours — a conservative annual average for the US, southern Europe and Australia (UK winters can fall below 1.5).

PV arrayReal harvest0–100% rechargeSun-days @ 4.5 PSHNet with load @ 50%
800 W 640 W 16.0 hrs 3.6 −3,040 W
1,600 W 1,280 W 8.0 hrs 1.8 −2,400 W
3,000 W 2,400 W 4.3 hrs 0.9 −1,280 W
6,000 W 4,800 W 2.1 hrs 0.5 +1,120 W
8,000 W 6,400 W 1.6 hrs 0.4 +2,720 W

A typical 800 W portable array refills the battery in about 16.0 hrs of strong sun, while maxing out the 8,000 W input cuts that to 1.6 hrs. To fully offset the Kia EV9 (32A Level 2 EV Charger) at a 50% duty cycle (3,680 W average) during daylight you need roughly 4,600 W of panels, which this unit can accept.

5. Frequently Asked Questions

Can the Selectronic SP Pro AU Off-Grid Inverter run a Kia EV9 (32A Level 2 EV Charger)?

Yes. The Selectronic SP Pro AU Off-Grid Inverter delivers 7,500 W continuous and 22,500 W surge, covering the Kia EV9 (32A Level 2 EV Charger)'s 7,360 W running and 7,360 W start-up draw at 98% inverter utilization, which is above the 80% guideline, so dedicate the unit to this load.

How many miles of range can the Selectronic SP Pro AU Off-Grid Inverter add to a Kia EV9?

A full 10,240 Wh charge delivers about 7.8 kWh to the vehicle battery after inverter (85%) and on-board charger (90%) losses — roughly 27 miles at 3.5 mi/kWh. At the full 7,360 W charge rate that takes 1.2 hrs.

What breaker and wire size do I need to connect a Kia EV9 (32A Level 2 EV Charger) to the Selectronic SP Pro AU Off-Grid Inverter?

At 230 V the load draws 32.0 A. Under BS 7671 / IEC 60364 the protective device must be at least the design current (Ib ≤ In ≤ Iz), so use a 32 A MCB with RCD protection on 4.0 mm² copper cable for runs up to 7.5 m (1.0% voltage drop). Connection: Type 2 EVSE · IEC 60309 32A Commando.

How long does it take to recharge the Selectronic SP Pro AU Off-Grid Inverter with solar panels?

With an 800 W array and an 80% real-world harvest factor, a full recharge takes about 16.0 hrs of peak sun (3.6 days at 4.5 peak-sun-hours). At its maximum 8,000 W solar input it drops to 1.6 hrs.

Methodology & safety note

Specifications come from manufacturer datasheets in our open dataset; ampacity and resistance values follow NEC Table 310.16 and Chapter 9 Table 8, and BS 7671 Appendix 4. Calculations assume copper conductors, 30 °C ambient and no bundling derating. Inverter-to-panel connections require a listed transfer switch or interlock to prevent back-feeding the grid. These results are an engineering estimate, not a substitute for a licensed electrician and local permit. See our methodology and safety disclaimer.

Status dots show the UK/EU/AU verdict: compatible, conditional, not compatible.

Other loads on the Selectronic SP Pro AU Off-Grid Inverter

All 50 loads on the Selectronic SP Pro AU Off-Grid Inverter →

Other power stations for the Kia EV9 (32A Level 2 EV Charger)

Compare every source for this load →

More Electric Vehicle Charging on the Selectronic SP Pro AU Off-Grid Inverter